redirect pin user minus plus fax mobile-phone office-phone data envelope globe outlook retail close line-arrow-down solid-triangle-down facebook globe2 google hamburger line-arrow-left solid-triangle-left linkedin wechat play-btn line-arrow-right arrow-right solid-triangle-right search twitter line-arrow-up solid-triangle-up calendar globe-americas globe-apac globe-emea external-link music picture paper pictures play gallery download rss-feed vcard account-loading collection external-link2 internal-link share-link icon-close2

IAC

New IAC automotive assembly plant

Key Information

Client

IAC

Location

Monterrey

Topline

33,290 m2

The Challenge


IAC was looking for a new manufacturing plant to supply a US automaker. Due to the size of the project and the intensive use of energy, only one BTS was possible.

The Solution


One of the key factors for IAC was the availability of labor and the location of the Santa Catarina submarket was preferred over the location of CiƩnega de Flores, although the latter option was cheaper. CBRE's experience in similar projects was essential because we had to guide the client to the most experienced developer who would take care of a 15-year lease term with a total transaction value of more than $40 million dollars.

Explore Other Case Studies